Pgw design jobs

Filter

My recent searches
Filter by:
Budget
to
to
to
Type
Skills
Languages
    Job State
    28 pgw design jobs found, pricing in USD

    I am in need of a telecom network specialist with extensive experience in IP networks. My goal is to design an M2M service on my network with a strong focus on: - HLD end-to-end from Device to PGW to our network to our customer servers - Bolstering security - save capacity Specifically, I am interested in developing robust device management and routing features, which would include but not be limited to: - Real-time monitoring - Comprehensive device provisioning - Configuration - Firmware updates Please only apply if you have experience in these areas and are able to deliver a swift, secure, and reliable solution.

    $532 (Avg Bid)
    $532 Avg Bid
    24 bids

    We need support in troubleshooting failing outgoing calls to determine what the root cause is. PGW 2200 is an SS7/C7 PTSN SoftSwitch Solution.

    $17 / hr (Avg Bid)
    $17 / hr Avg Bid
    3 bids

    Configure CISCO PGW 9.3.6 to populate GAP field for ANSI number portability while in signaling mode.

    $534 (Avg Bid)
    $534 Avg Bid
    3 bids

    You simply 1st implement SDN in M...Mininet then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $190 (Avg Bid)
    $190 Avg Bid
    2 bids

    You simply 1st implement SD...MATLAB or Java then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $180 (Avg Bid)
    $180 Avg Bid
    3 bids

    As we are in the generation where the use of modern gadgets likes phones and tablets increasing day by day, whi...mobile network operators are looking for the solutions to overcome this problem. As of now the most popular mobile network architecture is the Long Term Evolution Evolved Packet Core (4G/LTE-EPC). However, the current LTE-EPC is facing various issues like high cost, inflexibility, scalability and signalling overheads. To overcome these issues the LTE-EPC network functions like MME, HSS, SGW, PGW are redesigned using Network Function Virtualization (NFV) platforms . In this work we are using the linux containers and dockers for evaluating virtual LTE-EPC functions and also we will be introducing the benefitting functions for the module like scale-in, scale-out and...

    $18 - $153
    $18 - $153
    0 bids

    You simply 1st implement SD...MATLAB or Java then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $30 - $250
    $30 - $250
    0 bids

    You simply 1st implement SD...MATLAB or Java then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $40 (Avg Bid)
    $40 Avg Bid
    2 bids

    You simply 1st implement SDN in M...Mininet then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $250 (Avg Bid)
    $250 Avg Bid
    1 bids

    You simply 1st implement SDN i...FloodLight then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $155 (Avg Bid)
    $155 Avg Bid
    1 bids

    You simply 1st implement SDN i...FloodLight then add 2 schemes in it Proposed scheme 1: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use TRILL protocol. Trill use RBridge (it’s a layer 2 protocol) 4- RBridge use IS-IS (intermediate system – intermediate system) routing protocol. 5- Rbridge (which is a trill protocol) will be implemented between SGW and PGW both for incoming and outing routing 6- Removing ENodeB , use RBridge instead both for incoming and outgoing routing. Proposed scheme 2: 1- Remove GTP tunnelling protocol from between SGW and PGW 2- Remove EnodeB. 3- Use proxy mobile ipv6 (it’s a layer 3 protocol) 4- Proxy mobile ipv6 will be implemented between SGW and PGW 5- Use proxy mobile ipv6 in...

    $140 (Avg Bid)
    $140 Avg Bid
    2 bids

    • Thorough understanding of CSFB paging and overall MME Paging strategy • Understanding of Cisco paging counters and troubleshooting towards improvement of Paging Success. • Correlation and mapping of counters, disconnect reasons & analysis of traces & SSD in MME related with paging failures. • Expertise in configuration and design of MME, SGW, PGW and DNS, and their related capacities wrt License, hardware and interfaces. • Experience in dimensioning of Cisco EPC for big and diverse geography with S1-flex and MSS in pool and high traffic & subscriber base for Delhi Network.

    $388 (Avg Bid)
    $388 Avg Bid
    2 bids
    Trophy icon PGW Logo Design Ended

    PGW is at www.pgw.on.ca. Their logo is old and dated. They need a new logo that has "PGW" as the brandname + tagline "Geology-Driven Geophysical Consulting". The logo MUST have a representation of the earth or a globe -- it can be stylized. If you can fit it in, then also have "Paterson, Grant & Watson Limited"

    $158 (Avg Bid)
    Featured Guaranteed Sealed Top Contest
    $158
    200 entries

    Hi tzo, Long time. I need a script/cron Job that can, from a backup server (SUSE or CentOS, local path "/var/opt/DEIMOSebm/data/EPG_CDR_Backup/6/") to automatically sftp to server copy and delete files older than one day... the detailed sequence is : 1- sftp to remote server (IP example) 2 - Goes in remote server "/var/log/services/epg/pgw/cdr/Cdr_bkp" and Copy or GET the latest 1000 files older that one day, and delete them from the remote location. (meaning if there is more than 1000 files older that one day, they will be captured in the next Cron execution) No particular preference for the scripting language. Let me know you availability and price. Put a suggestion of 25$ US. Regards, Yves.

    $25 (Avg Bid)
    $25 Avg Bid
    1 bids

    ...scope of work. we will send detailed scope of work to the top three selected companies for further discussions. This project is about building an ecommerce (B2B2C) based on Magento2 ECE (we have ECE account) [B2C Platform] B2C Website development with customized front-end Multi-lingual including RTL Launch of Default Cybersource Payment Gateway (USD Base Currency) Developing Cybersource PGW (multi base currencies) and Adding Payplay / Alipay Follow SEO best practice Follow best web security practice Newsletter Website search Website API (to be used by mobile app/Dashboard) fields validations Website optimization [B2B Marketplace] Installing Webkul Multi Vendor Marketplace Installing Webkul Extensions: Advanced Commission Marketplace Custom Attribute ...

    $7693 (Avg Bid)
    $7693 Avg Bid
    126 bids

    1. Integrate Instamojo and Razorpay with Shopdrill.com. 2. Improve and insert functionality in Minicategory, Subcategory and Category pages for , by making products loading as page is scrolled down instead of pagination currently present and collapsing left hand filter windows.

    $12 - $12
    $12 - $12
    0 bids

    I want to examine their LTE in queue management algorithms. But I do not know where the queue is working. Is it eNodeB or EPC (sGW, pGW) ?? a simulation to be as follows. There will be one NodeB. each eNodeB connected to at least 20-40-60-80 user equipment. Each user voice, ftp will use the web service. For they will be randomly generated data. eNodeB to communicate with each other. red, blue will be supported by the program, such as at least 5 algorithms. (red, droptail, pfifo, codel etc) In comparison to the following topics; queue length dropping package band width packet loss rate

    $266 (Avg Bid)
    $266 Avg Bid
    8 bids

    ...paymetns due, green for zero balance - Owner - List of owners currently being managed by the Property Manager - Each owner has a list of properties - Each property has a data base of their pgw, pwd, brt, peco, services, lease and rent standing - Each owner has a data base of the rents paid and due - Tenant - List of tenant currently in properties being managed by the Property Manager - Tenant has a data base of rent payment history, services request -Properties - View list of properties - Each property has a data base of their pgw, pwd, brt, peco, rent standing - Ability to pay pgw, pwd, peco bill - Ability to add property - Can assign owner - Can assign tenant - Can assign lease - Handyman - List of available Handymen - Handymen has a d...

    $568 (Avg Bid)
    $568 Avg Bid
    6 bids

    I have a PGW version 9.5(2) in signaling mode and Cisco As5350 acting as SLT terminating 2E1 lines with another partner. E1 line1 has signaling at Time slot 1 and voice slots on rest of voice channels. E1 line 2 has only voice channels under control of signaling on E1 line1. The gateway receives traffic over IP and sends it to PSTN over those 2E1s. The task is to terminate traffic from dial-peer A, to E1line 1 and from other VoIP dial peer B to E1 line N2. Preferably the configuration and change in routing should be done at the Cisco ASserver , not on the PGW

    $77 (Avg Bid)
    $77 Avg Bid
    2 bids

    Looking for a reliable and professional SEO team to optimize our wholesale website. We have selected hundreds of keywords and waiting for you to get them ranking on top 3 pages in Google.com. I have attached the keywords list and project requirement in the excel file, please download and check. Thanks.

    $1037 (Avg Bid)
    $1037 Avg Bid
    6 bids

    Looking for a reliable and professional SEO team to optimize our wholesale website. We have selected hundreds of keywords and waiting for you to get them ranking on top 3 pages in Google.com. I have attached the keywords list and project requirement in the excel file, please download and check. Thanks.

    $1269 (Avg Bid)
    $1269 Avg Bid
    3 bids

    I need somebody to configure a system consisting in two Cisco AS54XM gateways, two Cisco PGW2200 (Sun Fire) servers. I have the OPC/DPC pairs and all the correct inter...Cisco system so we can dump the nokia and start using Cisco. System description: There are currently two E1 links , each link goes to its own AS54XM gateway. Each AS54XM gateway has mtp2 links to each PGW server (total of two servers). I could get the Serial (E1) links to go up , and the farther that I manage to get (at some point) is to have the SS7 links bouncing . Now (in light of recent modifications i did) , both SS7 links are out of service. (I have two DPCs). Also, i cannot seem to manage to get back the two PGW servers in sync . Whichever starts first, it will be the active PGW. The se...

    $1250 (Avg Bid)
    $1250 Avg Bid
    1 bids

    I need somebody to configure a system consisting in two Cisco AS54XM gateways, two Cisco PGW2200 (Sun Fire) servers. I have the OPC/DPC pairs and all the correct inter...Cisco system so we can dump the nokia and start using Cisco. System description: There are currently two E1 links , each link goes to its own AS54XM gateway. Each AS54XM gateway has mtp2 links to each PGW server (total of two servers). I could get the Serial (E1) links to go up , and the farther that I manage to get (at some point) is to have the SS7 links bouncing . Now (in light of recent modifications i did) , both SS7 links are out of service. (I have two DPCs). Also, i cannot seem to manage to get back the two PGW servers in sync . Whichever starts first, it will be the active PGW. The se...

    $250 - $750
    Featured Sealed
    $250 - $750
    1 bids

    have web site in joomla I need some finishing touches put on it. I do not have a big budget. I am a small breeder with limited funds. - Add Below topics should be monitored Color Genetics Manipulating Goat Genetics A.I. Artificial Insemination FAQ About Genetics Genetic Software Historical Animals Herd Names Starting With A one for each letter or series of letters 2. Update Contact Information Contact Us 3. Home Calendar of Events Fourm Articles News Links Shopping Contact Us Subscribe Links need it set up to work with link exchange 4. Under visitor counter would like Can We put Sponsors here with place holders? and some place holders with your ad here Low Cost and an email to us. 5. RSS Links need to be added Need to ...

    $225 (Avg Bid)
    $225 Avg Bid
    2 bids
    PGW Ended

    Would like to if possible purchase this X-oops design called Graphix shown here see link below and have it changed to show a pygmy goat where the film is and the links designed to fit our new xoops site Please let me know time, suggestions, comments. I have pictures of pygmy goats. Would like designer familiar with x-oops that can also upload the design to the site.

    $199 (Avg Bid)
    $199 Avg Bid
    5 bids

    Need a banner(s) designed for new web site the site is all about Pygmy Goats and highlights historical animals with pictures and pedigrees. Sizes: 125x125, 120x240 and 468x60. Banner should be creative and original. Please PM with ideas, cost, and time period.

    $42 (Avg Bid)
    $42 Avg Bid
    19 bids

    I want you to make a template for a site that will be called playagrandeway.com. Playa Grande is a touristic destiny in Dominican Republic, where I live. The site will promote this touristic region and promote the practice of naturism in the zone. I want it to be a good looking site, with the simpleness of makaharesort.com. I want you to make a little logo that reads PGW, in the same place of the strange bird in Makaharesort. I want the menus displays submenus when the mouse pointer is on them (like in ) I will provide you with all the text and pictures. It will have a main page (home) and different pages for each one of the following menus: Real estate(submenus display links to properties), Cheap Transportation (no submenu displayed when mouse is on top), Clothing

    $243 (Avg Bid)
    $243 Avg Bid
    4 bids